Shires Extra Long Lead Rope (0001SHXL)

$11.99

Shires Extra Long Lead Rope

A useful extra long lead rope with a brass swivel trigger clip. Length: 3m.

Add to Wishlist
Add to Wishlist
SKU: 0001SHXL Categories: ,

Description

Shires Extra Long Lead Rope

Features:

  • Durable extra long lead rope
  • Brass swivel trigger clip

Additional information

Weight1 lbs
Dimensions6 × 6 × 6 in
Color

Navy, Black, Green, Purple, Sky Blue, Pink, Red, Orange